Piles of rock in the parking lot that were all shoveled by hand and carted over by hand. |
We decided to dig up the existing bark path and put in a new rock pathway lined with leftover dry stack rock. |
The existing path had to be dug down 3-4" as well. |
Each stone had to carefully measured and placed. |
It was a great team effort. |
On top of the road base we put 4-5 inches of Chat Fire rock. |
The road base was then compacted onto the pathway. |
Almost done placing each of the rocks. |
The decorative rock was then put on top of the road base. |
More compaction time. |
Didn't it turn out great? |
The pathway is so nice we don't want to step on it. |
Great Job, it really looks good.